1. The
materials shall be firstly mixed in accordance with the proportion
on the label of the package. (inner wall:2:1 or 1:0.5, outer
wall: 1.4 or 1:0.7). Make sure they are blended sufficiently
before use.
2. Use
blader, roller and brush to apply the ANDESS coating system
in accordance with the specified procedures.
3. For
scratch coating, use steel trowel or scraper to press the
putties in full strength, with special care to avoid uneveness
or exposure of the base. It is always best to start and finish
painting in a corner because it will eliminate any tap marks
that might occur. For roller coating and brush coating, proceed
following the routine steps.
4.
Each time coat should be made after the previous coat is completely
dried. The
interval time is generally 2 hours.
5. Topwork
liquid is offered for enhanced wash fastness and penetration
resistance. Customer may choose upon needs.
|
1. The
surface of base layer is required in even, smooth, clear and
solid state as paint will not adhere to even the slightest
dirt residue. Shedding, pores, seams, oily stains, float dust
and chalky residue shall be eliminated.
2. For
steps, shallow areas and wading pools, we recommend sprinkling
white sand or marble dust (mixed in proportion of 1:3) on
the paint before it dries to make the area even and slip-resistant.
3. The
new coating shall leave untouched for a certain period before
second coat is applied. Generally, 28 days for cement mortar
surface and above 14 days in summer.
4. The water ratio of base layer shall not exceed 10%.
5. For
base layer with large water absorption, top seal treatment
is required.
6. The
base layer of outer wall must be top coated with alkaliproof
solution. However, base layer of inner wall will be coated
depended on its specific condition.
7.Acid etching is required on bare masonry surfaces like concrete
or plaster. Liberally brush the oxalic acid solution on the
surface to remove the alkali corrosion. Rinse off the acid
with clear water and top coat with alkaliproof liquid. If
the PH value of inner wall is higher than 10, alkaliproof
coat is necessary.
|
1. Before
application, make sure the site is cleaned up to prevent dust
emission.
2. The
working temperature is best between 5℃
and 40℃
(Andess top coat) or 5℃
to 35℃
(other coats). Excessive moisture or dryness shall be avoided.
If application requires high skill or in high complexity,
we suggest you to have a pre-try before actual coating.
3. Coating
of outer wall shall not be made under bad weather conditions
such as violently sunshine exposure, raining and strong wind.
4. Special
care shall be give to the protection of newly-coated surface.
Don't clean up the site or start any other works before the
layer get dried completely as it may cause contamination by
dust or filthy water. Other damages as may caused by rain,
vapor, accident touch or scratch shall also be avoided.
|
1. ANDESS
powder coatings are stored and handled as non-harzard goods.
2. The
2k powder coatings shall be kept in dry conditions and prevent
from penetration of rain and moisture to avoid block formation,
which may degrade the performance of coatings, and avoid careless
mixing of impurities. Besides, materials shall be assorted
and kept according to classified standards and grades.
3. Liquid-contained
coatings such as paint and paste coatings shall be kept in
ventilated dry place without direct sunshine exposure. Rain
and volient sunshine shall be avoided during the transportation.
The environement temperature is best between 5℃
and 40℃
(Andess top coat) or 5℃
to 35℃
(other coats). Pay attention not to place the box upside down
or in tilt degree. Allowed piling capacity shall refer to
the instructions marked on the package.
4. The
coatings are best used before the quality assurance period,
which refers to the time period from the date of manufacture
to the date stated on the package, under the preconditions
that the coatings are properly stored and transported. However,
provided such a period expires or the coatings fail to be
kept or transported in appropriate manner, if tested in compliance
with quality standard, the coatings can still be used.
|
Powder:
12 months
Solution:
6 months
Paste:
6 months
|
|
Andess
mid-coat and base coat (for evening purpose or style-creation
purpose)
|
1. The
materials shall be firstly mixed in accordance with the proportion
on the label of the package. (inner wall:2:1 or 1:0.5, outer
wall: 1.4 or 1:0.7). Make sure they are blended sufficiently
before use.
2. Use
blader, roller and brush to apply the ANDESS coating system
in accordance with the specified procedures.
3. For
scratch coating, use steel trowel or scraper to press the
putties in full strength, with special care to avoid uneveness
or exposure of the base. It is always best to start and finish
painting in a corner because it will eliminate any tap marks
that might occur. For roller coating and brush coating, proceed
following the routine steps.
4. Each
time coat should be made after the previous coat is completely
dried. The
interval time is generally 2 hours.
|